Case Study 4 – Theatre upgrade at HMS Raleigh
MTES were tasked with the complete upgrade of a 532 seat theatre at HMS Raleigh, Plymouth.
The work package included the removal and replacing of the non-fixed stage. The new fixed stage incorporated access steps, ramp for wheelchair access and safety handrails.
The seating was removed and replaced with new. The front row seating is removable for wheelchair access.
All carpeting was taken up and replaced with new along with new velvet curtains made for the stage together with black backdrop curtains in specialist fire retardant material.
The complete theatre was given an electrical upgrade and new decoration to bring the completed works up to a high level of finish.